| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | 百度

Charging piles installed at 11 taxi beckoning stations in Beijing

百度 值得一提的是,本场比赛中国杯主办方万达集团董事长王健林也来到现场观战,但是赛后他显得脸色铁青,显然对于这个结果很不满意。

2018-07-16 15:42 千龙网

打印 放大 缩小

A taxi is charging at a taxi beckoning station near Beijing Technology and Business University, May 4, 2017. [Photo by Zhao Rong/tuku.qianlong.com]

A total of 11 taxi beckoning stations with charging piles were put into use for electric taxis in Beijing from May 4, 2017.

In order to better support the demonstration operation of electric taxis in Beijing, charging piles were installed at taxi beckoning stations to serve for taxis’ charging from 2017.

Five of the 11 chargeable taxi beckoning stations are in Haidian district, four in Chaoyang district and two in Fengtai district. Each station is installed with two DC charging piles to satisfy charging for two taxis at the same time. The two charging piles are estimated to be able to charge 40 taxis per day. It takes about one to one and half hours for a taxi to fully charge via scanning code on the “Youyichong” APP.

Currently, there are about 500 electric taxis operated in downtown Beijing and 3,050 ones in suburban areas. It is estimated that the 11 chargeable taxi beckoning stations in downtown areas are capable of charging 440 taxis in a single day. The transport departments plan to install more charging piles at taxi beckoning stations according to the plan and feedbacks of taxi drivers.

It is noteworthy that the 11 stations are exclusive to taxis and social vehicles are not allowed to park for charging. And the taxis should leave the charging space as soon as they complete charging at the station.


A taxi is charging at a taxi beckoning station near Beijing Technology and Business University, May 4, 2017. [Photo by Zhao Rong/tuku.qianlong.com]

责任编辑:Ai Ting(QN0043)

Related Stories

五四场 关岭布依族苗族自治县铜仁市 田心仔 长途汽车总站 罗岗镇
厚全村 崎峰社区 下河清乡 白兴吐 海南区
百度